Foundation Test Equipment for MHI Vestas Offshore Wind

At the beginning of 2017, MHI Vestas Offshore Wind was looking for a supplier that could deliver testing equipment to conduct simulations and various scenarios of how equipment contained within the foundation would perform when installed with a wind turbine.

Background

Kristian Bonde Jensen, the test specialist from MHI Vestas explains “The reason for us to develop such a product was because in this case, some MVOW electrical equipment is installed in the foundation. Therefore, we are not actually in possession of the products until the turbine is installed offshore. Therefore, it is important to us to have a solution that would enable us to test each component onshore prior to WTG installation and have the assurance that the entire infrastructure of the foundation would match up with the wind turbine once installed offshore”

Choosing the right supplier

It was the first time that MHI Vestas Offshore Wind was taking upon designing such comprehensive testing equipment. This interface, therefore, required a close collaboration between the parties as well as a supplier that could bring a strong know-how to the project. Kristian Bonde continues, ‘We decided to choose Eltronic Wind Solutions as a supplier, mainly because Eltronic was one of the few suppliers able to deliver the entire scope of supply and put the complete solution together, moreover, we have a good track record of collaboration with Eltronic, so we knew what they were capable of delivering’

 

 

"We decided to choose Eltronic Wind Solutions as a supplier, mainly because Eltronic was one of the few suppliers able to deliver the entire scope of supply and put the complete solution together, moreover, we have a good track record of  collaboration with Eltronic, so we knew what they were capable of delivering"                                                                                                                                                                                   

Kristian Bonde Jensen

  Test specialist from MHI Vestas 

The Solution

Any offshore operation is approximately 10 times more expensive than operation onshore, therefore every test conducted on sea constitutes for extra costs of the vessel and additional hours of transporting the components back and forth. Being able to test equipment onshore, allows for quick adjustments of the interface and significant reduction of time spent on the testing. The tester for from Eltronic, which was closely designed with MHI Vestas Offshore Wind, allows for a test of all interfaces between the components on the harbor and make sure that the equipment is mounted correctly before being installed on the site.

 Solution highlights

 One complete solution

 Increased safety due to comprehensive tests and simulations of the components.

 Lower costs of the operation due to the tests being conducted on the harbor and not on the vessel.

 The tester is equipped with heaters in the panels in order to enable safe storage on the harbor in cold conditions.

 Ability to generate test reports

About MHI Vestas Offshore Wind

MHI Vestas Offshore Wind was founded in April 2014, but the company stands on the shoulders of giants. Its parent companies are two of the global leaders in wind power and offshore ventures - Vestas Wind Systems A/S and Mitsubishi Heavy Industries Ltd. MHI Vestas Offshore mission is to co-develop offshore wind as an economically viable and sustainable energy resource to benefit future generations.

Future Collaboration

Kristian Bonde Jensen comments on future collaboration with Eltronic Wind Solutions “We are in the process of conducting several other projects with Eltronic that will take place this year. The solutions are testers for a long and short tower which follow the same philosophy of conducting simulations onshore. The testers will be initially used on a site in Denmark (Esbjerg) and the Netherlands and potentially in US and Asian markets.